Sunday, May 10, 2026
7:00 am

EventDate/TimeLocation
Race Kit Pick UpFriday, May 8, 2026
5:00 pm – 8:00 pm
Delta Fredericton
Race Kit Pick UpSaturday, May 9, 2026
9:00 am – 5:00 pm
Delta Fredericton
NO SUNDAY RACE KIT PICK UP
42.2k RaceSunday, May 10, 2026
7:00 am
Queen’s Square

Marathon participants line up on the south side of St. John St at the corner of Aberdeen and St. John streets. Runners will head north on St. John St up to Queen St, turning left toward the north turn lane continue along Queen St to Regent St/Saint-Anne’s Point Dr intersection. Runners turn onto Saint-Anne’s Point Dr, heading toward the Westmorland Street Bridge. Runners then run up the ramp onto the bridge continuing to the second off ramp, exiting onto Union St heading diagonally across the street toward Friel St.

Runners then head up Friel St., turning left onto the Northside Trail, continuing along this trail heading toward the first turnaround just past Dayton cemetery at Blake Crt.

Runners will cross Douglas Ave, Fulton Ave, Brookside Dr, Royal Road, Sunset Dr, Ruby Crt, Jasper St, Grasse Cir, Pearl St (twice), and turn around just after Blake Crt. Runners return along the same trail past Friel St to the Nashwaak Trail, and turn right heading south across the Bill Thorpe Walking Bridge. Runners will continue along the trail to Aberdeen St and turn right staying to the right side of the road to start their second loop of the marathon.

Passing the gantry, runners continue to St. John St, turning left on St. John St up to McLeod Ave. At McLeod Ave, runners turn left, following the roadway up to the Crosstown Trail, where participants will continue several metres to the Lincoln Trail and turn left heading to the Bill Thorpe Walking Bridge.

After crossing the bridge, runners continue along the trail to the Gibson Trail intersection, where they will then turn right. Following the Gibson Trail all the way toward Marysville, crossing Greenwood Dr twice. Upon exiting the Gibson Trail, runners continue onto McGloin St, following the road close to the sidewalk following the white line all the way up to Bridge St. At Bridge St, runners turn left following the sidewalk across the bridge to the end then turn right, crossing Bridge St. Runners will head along the trail to the turnaround point located just past Chase’s Christmas Tree Farm, and turn around heading straight back along the Nashwaak Trail.

Runners will cross Bridge St, Canada St (twice), heading toward the Bill Thorpe Walking Bridge. Runners will follow the trail across the bridge to Aberdeen St where they will turn right and head directly to the finish line at Queen Square Park.